Consultation Summer 2022 Documents
Consultation Autumn 2021 Documents
PEIR VOLUME 1
- Volume 1 Table of Contents
- Chapter 1 - Introduction
- Chapter 2 - Planning Policy Context
- Chapter 3 - Need and Alternatives Considered
- Chapter 4 - Existing Site and Operation
- Chapter 5 - Project Description
- Chapter 6 - Approach to Environmental Assessment
- Chapter 7 - Historic Environment
- Chapter 8 - Landscape Townscape and Visual Resources
- Chapter 9 - Ecology and Nature Conservation
- Chapter 10 - Geology and Ground Conditions
- Chapter 11 - Water Environment
- Chapter 12 - Traffic and Transport
- Chapter 13 - Air Quality
- Chapter 14 - Noise and Vibration
- Chapter 15 - Climate Change and Carbon
- Chapter 16 - Socio-Economics
- Chapter 17 - Health and Wellbeing
- Chapter 18 - Agricultural Land Use and Recreation
- Chapter 19 - Cumulative Effects and Inter-relationships
- Chapter 20 - Summary of Effects
PEIR 2021 Volume 2
CHAPTER 5
Figure 5.2.1a - Airfield/Airport Works - Sheets 1 and 2
Figure 5.2.1c - Hotels and Commercial Elements
Figure 5.2.1d - Surface Access Improvements
Figure 5.2.1e - Surface Water and Foul Water Improvements
Figure 5.2.1f - Principal Construction Compounds
Figure 5.2.1g - Potential Environmental Mitigation and Enhancement Areas
Figure 5.2.1h - Existing Facilities to be Demolished or Removed
CHAPTER 7
Figure 7.6.1 - Non-Designated Heritage Assets within 1 km of The Project Site Boundary
Figure 7.6.2 - Designated Heritage Assets within 3km of The Project Site Boundary
Figure 7.6.3 - Designated Heritage Assets within 3km of The Project Site Boundary and Within the ZTV
Figure 7.6.4 - Designated Heritage Assets at Charlwood in Relation to the ZTV
Figure 7.6.5 - Predictive Modelling of Zones of Archaeological Potential
CHAPTER 8
Figure 8.4.2 - National Landscape Character Areas and Landscape Designations
Figure 8.4.3 - Existing Zone of Theoretical Visibility and Viewpoint Locations
Figure 8.4.4 - Viewpoint 1: Airport Way / Public Right of Way 346/2Sy (Sussex Border Path)
Figure 8.4.5 - Viewpoint 2: Orange Short Stay Multi Storey Car Park
Figure 8.4.6 - Viewpoint 3: Car Rental South Terminal Public Right of Way 360/Sy
Figure 8.4.7 - Viewpoint 4: River Mole Public Right of Way 346 (Sussex Border Path)
Figure 8.4.8 - Viewpoint 5: River Mole Public Right of Way 346 (Sussex Border Path)
Figure 8.4.9 - Viewpoint 6: Riverside Garden Park National Cycle Route 21
Figure 8.4.10 - Viewpoint 7: Horley Riverside
Figure 8.4.11 - Viewpoint 8: Public Right of Way 362a North of A23 & South Terminal
Figure 8.4.12 - Viewpoint 9: Balcombe Road at Pentagon Field
Figure 8.4.13 - Viewpoint 10: Public Right of Way 359/Sy at Pentagon Field
Figure 8.4.14 - Viewpoint 11: Public Right of Way 360/1SY at Tinsley Green
Figure 8.4.15 - Viewpoint 12: Bridleway 352/Sy at Rowley Farm
Figure 8.4.16 - Viewpoint 13: Ifield Road
Figure 8.4.17 - Viewpoint 14: Public Right of Way 344 (Sussex Border Path) East of Charlwood
Figure 8.4.18 - Viewpoint 15: Norwood Hill
Figure 8.4.19 - Viewpoint 16: Turners Hill
Figure 8.4.20 - Viewpoint 17: Tilgate Park
Figure 8.4.21 - Aerial Photography and Visual Receptor Locations
Figure 8.6.2 - District Landscape and Townscape Character Areas Within 5 km Radius
Figure 8.6.3 - 2018 Baseline Gatwick Overflights
Figure 8.6.4 - All 2018 Baseline Overflights Within 35 mile Radius
Figure 8.6.5 - Increase in Gatwick Overflights
Figure 8.6.6 - Increase in Gatwick Overflights Compared with All Overflights
Figure 8.9.1 - Existing and Proposed Wireline - Winter Viewpoint 1
Figure 8.9.2 - Single Frame Wireline - Winter Viewpoint 1
Figure 8.9.3 - Existing and Proposed Wireline - Summer Viewpoint 1
Figure 8.9.4 - Single Frame Wireline - Summer Viewpoint 1
Figure 8.9.5 - Existing and Proposed Wireline - Winter Viewpoint 2
Figure 8.9.6 - Single Frame Wireline - Winter Viewpoint 2
Figure 8.9.7 - Existing and Proposed Wireline - Summer Viewpoint 2
Figure 8.9.8 - Single Frame Wireline - Summer Viewpoint 2
Figure 8.9.9 - Existing and Proposed Wireline - Winter Viewpoint 4
Figure 8.9.10 - Single Frame Wireline - Winter Viewpoint 4
Figure 8.9.11 - Existing and Proposed Wireline - Summer Viewpoint 4
Figure 8.9.12 - Single Frame Wireline - Summer Viewpoint 4
Figure 8.9.13 - Existing and Proposed Wireline - Winter Viewpoint 5
Figure 8.9.14 - Single Frame Wireline - Winter Viewpoint 5
Figure 8.9.15 - Existing and Proposed Wireline - Summer Viewpoint 5
Figure 8.9.16 - Single Frame Wireline - Summer Viewpoint 5
Figure 8.9.17 - Existing and Proposed Wireline - Winter Viewpoint 6
Figure 8.9.18 - Single Frame Wireline - Winter Viewpoint 6
Figure 8.9.19 - Existing and Proposed Wireline - Summer Viewpoint 6
Figure 8.9.20 - Single Frame Wireline - Summer Viewpoint 6
Figure 8.9.21 - Existing and Proposed Wireline - Winter Viewpoint 8
Figure 8.9.22 - Single Frame Wireline - Winter Viewpoint 8
Figure 8.9.23 - Existing and Proposed Wireline - Summer Viewpoint 8
Figure 8.9.24 - Single Frame Wireline - Summer Viewpoint 8
Figure 8.9.25 - Existing and Proposed Wireline - Winter Viewpoint 9
Figure 8.9.26 - Single Frame Wireline - Winter Viewpoint 9
Figure 8.9.27 - Existing and Proposed Wireline - Summer Viewpoint 9
Figure 8.9.28 - Single Frame Wireline - Summer Viewpoint 9
Figure 8.9.29 - Existing and Proposed Wireline - Winter Viewpoint 10
Figure 8.9.30 - Single Frame Wireline - Winter Viewpoint 10
Figure 8.9.31 - Existing and Proposed Wireline - Summer Viewpoint 10
Figure 8.9.32 - Single Frame Wireline - Summer Viewpoint 10
Figure 8.9.33 - Existing and Proposed Wireline - Summer Viewpoint 13
Figure 8.9.34 - Single Frame Wireline - Summer Viewpoint 13
Figure 8.9.35 - Existing and Proposed Wireline - Winter Viewpoint 15
Figure 8.9.36 - Single Frame Wireline - Winter Viewpoint 15
CHAPTER 11
Figure 11.4.1 - Water Environment Study Area
Figure 11.6.1 - General Water Features
Figure 11.6.2 - Environment Agency Published Flood Zones
Figure 11.6.3 - Upper Mole Model 1% (1 in 100) AEP Event Extents and Flood Zone 3 Extents
Figure 11.6.4 - Areas at Risk of Flooding from Surface Water Extents
Figure 11.6.5 - Areas Susceptible to Groundwater Flooding
Figure 11.6.6 - Areas Susceptible to Groundwater Flooding
Figure 11.6.7 - Contaminated Water Path - Existing
Figure 11.6.8 - Groundwater Level and Aquifer Deisgnation
Figure 11.6.9 - Wastewater Infrastructure 2021
Figure 11.8.1 - Contaminated Water Path - Existing
Figure 11.8.2 - Project Wastewater Infrastructure
CHAPTER 13
Figure 13.4.1 - Location of 11 km x 10 km Domain and Air Quality Management Area
Figure 13.6.1 - Location of Local Planning Authority Monitoring in the 11 km x 10 km Domain
Figure 13.9.1 - Construction Dust Buffers for Construction Compounds
Figure 13.9.2 - Construction Dust Buffers for Maintenance Airfield Facilities
Figure 13.9.3 - Construction Dust Buffers for the Northern Runway
Figure 13.9.4 - Construction Dust Buffers for Airfield Works
Figure 13.9.5 - Construction Dust Buffers for Pier 7
Figure 13.9.6 - Construction Dust Buffers for the Terminal Extensions
Figure 13.9.7 - Construction Dust Buffers for Hotel and Commercial Facilities
Figure 13.9.8 - Construction Dust Buffers for Car Parks
Figure 13.9.9 - Construction Dust Buffers for Surface Access Improvements
Figure 13.9.10 - Construction Dust Buffers for Flood Compensation Areas
Figure 13.9.11 - Construction Dust Buffers for Environmental Mitigation Areas
Figure 13.9.12 - Construction Dust Buffers for Trackout
CHAPTER 14
Figure 14.4.1 - Baseline Noise Monitoring Sites
Figure 14.6.1 - 2019 Baseline Leq 16 hr
Figure 14.6.2 - 2019 Air Noise Baseline Leq 8 hr Night
Figure 14.6.3 - 2019 Air Noise Baseline N65 Day
Figure 14.6.4 - 2019 Air Noise Baseline N60 Night
Figure 14.6.5 - 2019 Air Noise Baseline Lden Annual Average 24 Hour
Figure 14.6.6 - 2019 Air Noise Baseline LNight Annual Average Night
Figure 14.6.7 - 2018 Baseline Gatwick Overflights
Figure 14.6.8 - 2018 Baseline Non-Gatwick Overflights
Figure 14.6.9 - 2018 Baseline All Airport Overflights
Figure 14.6.10 - 2018 Baseline Road Traffic Noise Levels
Figure 14.6.11 - 2032 Air Noise Baseline Leq 16 hr
Figure 14.6.12 - 2032 Air Noise Baseline Leq 8 hr Night
Figure 14.6.13 - 2032 Air Noise Baseline N65 Day
Figure 14.6.14 - 2032 Air Noise Baseline N60 Night
Figure 14.6.15 - 2032 Air Noise Baseline Lden Annual Average 24 Hour
Figure 14.6.16 - 2032 Air Noise Baseline LNight Annual Average Night
Figure 14.6.17 - 2032 Road Traffic Business as Usual Noise Levels
Figure 14.6.18 - 2038 Air Noise Baseline Leq 16 hr
Figure 14.6.19 - 2038 Air Noise Baseline Leq 8 hr Night
Figure 14.6.20 - 2038 Air Noise Baseline N65 Day
Figure 14.6.21 - 2038 Air Noise Baseline N60 Night
Figure 14.6.22 - 2038 Air Noise Baseline Lden Annual Average 24 Hour
Figure 14.6.23 - 2038 Air Noise Baseline LNight Annual Average Night
Figure 14.8.1 - Proposed Noise Insulation Scheme Zones
Figure 14.9.1 - 2032 Air Noise with Project Leq 16 hr and Community Representative Locations
Figure 14.9.2 - 2032 Air Noise with Project Central Case v 2032 Baseline Difference Leq 16 hr
Figure 14.9.4 - 2032 Air Noise with Project v 2019 Baseline Difference Leq 16 hr
Figure 14.9.6 - 2013 Air Noise Baseline Leq 16 hr
Figure 14.9.7 - 2032 Air Noise with Project Leq 8 hr Night
Figure 14.9.8 - 2032 Air Noise with Project Central Case v 2032 Baseline Difference Leq 8 hr Night
Figure 14.9.10 - 2032 Air Noise with Project Central Case v 2019 Baseline Difference Leq 8 hr Night
Figure 14.9.12 - 2013 Air Noise Baseline Leq 8 hr Night
Figure 14.9.13 - 2032 Air Noise with Project N65 Day
Figure 14.9.14 - 2032 Air Noise with Project Central Case v 2032 Baseline Difference N65 Day
Figure 14.9.16 - 2032 Air Noise with Project Central Case v 2019 Baseline Difference N65 Day
Figure 14.9.17 - 2032 Air Noise with Project Slower Transition Case v 2019 Baseline Diference
Figure 14.9.18 - 2032 Air Noise with Project N60 Night
Figure 14.9.19 - 2032 Air Noise with Project Central Case v 2032 Baseline Difference
Figure 14.9.21 - 2032 Air Noise with Project Central Case v 2019 Baseline Difference N60 Night
Figure 14.9.23 - 2032 Air Noise Baseline and Northern Runway A320 Lmax 60 and 65dB Footprints
Figure 14.9.24 - 2032 Air Noise Baseline and Northern Runway A320 Neo Lmax 60 and 65dB Footprints
Figure 14.9.25 - A320 Departure Lmax Examples: Northern Runway versus Baseline Difference
Figure 14.9.26 - 2032 Air Noise Lden Annual Contours with the Project
Figure 14.9.27 - 2032 Air Noise LNight Annual Contours with the Project
Figure 14.9.28 - 2032 Departure Overflights from the Main and Northern Runways
Figure 14.9.29 - All Airport Overflights with Project Flights (20%)
Figure 14.9.30 - 2032 Air Noise Project Leq 16 hr and Noise Sensitive Community Buildings
Figure 14.9.31 - 2032 Traffic Noise Levels wit Project
Figure 14.9.32 - 2032 Traffic Noise Levels with Project with Mitigation
Figure 14.9.33 - 2032 Traffic Noise Levels with Project with Mitigation v 2032 Base
Figure 14.9.34 - 2038 Air Noise with Project Leq 16 hr
Figure 14.9.35 - 2038 Air Noise with Project Leq 8 hr Night
Figure 14.9.36 - 2038 Air Noise with Project N65 Day
Figure 14.9.37 - 2038 Air Noise with Project N60 Night
Figure 14.9.38 - 2038 Air Noise Lden Annual Contours with the Project
Figure 14.9.39 - 2038 Air Noise LNight Annual Contours with the Project
Figure 14.9.40 - 2047 Road Traffic Noise Business as Usual
Figure 14.9.41 - 2047 Road Traffic Noise Level with Project with Mitigation
Figure 14.9.42 - 2047 Road Traffic Noise Level with Project with Mitigation v 2032 Base
CHAPTER 16
Figure 16.4.1 - Project Boundary, Local Study Area and Labour Market Area
Figure 16.4.2 - Project Boundary, Local Study Area, Labour Market Area and Five Authorities Area
Figure 16.6.1 - Economic Activity: Economically Active (16-64 year olds)
Figure 16.6.4 - Highest Level of Qualification: NVQ Level 3 and Level 4+ (16-64 year olds)
Figure 16.6.5 - Highest Level of Qualification: NVQ Level 1 and No Qualifications (16-64 year olds)
Figure 16.6.6 - Indices of Multiple Deprivation, 2019
Figure 16.6.7 - Commuting Flows (2011) into Project Boundary Area from Labour Market Area
Figure 16.6.8 - Number of Gatwick Passholders
Figure 16.6.9 - Community Facilities: Education
Figure 16.6.10 - Community Facilities: GP Surgeries and Dental Surgeries
Figure 16.6.12 - Community Facilities: Sports, Leisure and Recreation
Figure 16.6.13 - Community Facilities: Greenspace
Figure 16.6.14 - Median House Prices
Figure 16.6.15 - Median House Prices - Five Year Increase
PEIR 2021 Volume 3: Appendices
- Volume 3 Table of Contents
- Appendix 1.8.1 - Statement of Expertise
- Appendix 2.2.1 - National Planning Policy Context
- Appendix 3.3.1 - Key Requirements for Optioneering
- Appendix 4.3.1 - Forecast Data Book
- Appendix 5.2.1 - Highway Improvement Plans
- Appendix 5.3.1 - Outline Code of Construction Practice
- Appendix 5.3.2 - Draft Waste Strategy
- Appendix 5.3.3 - Major Accidents and Disasters
- Appendix 5.4.1 - Draft Energy Strategy
- Appendix 5.5.1 - Key Parameters and Indicative Construction Programme
- Appendix 6.2.1 - Scoping Responses and Location Within PEIR
- Appendix 6.2.2 - Schedule 4 Requirements of the Infrastructure Planning Regulations: Location Within PEIR
- Appendix 6.2.3 - Transboundary Screening Matrix
- Appendix 7.3.1 - Summary of Stakeholder Scoping Responses - Historic Environment
- Appendix 7.6.1 - Historic Environment Baseline Report (Part 1)
- Appendix 7.6.1 - Historic Environment Baseline Report (Part 2)
- Appendix 7.6.1 - Historic Environment Baseline Report (Part 3)
- Appendix 8.2.1 - Summary of Local Planning Policy: Landscape, Townscape and Visual Resources
- Appendix 8.3.1 - Summary of Stakeholder Scoping Responses – Landscape, Townscape and Visual Resources
- Appendix 8.4.1 - Landscape, Townscape and Visual Impact Assessment Methodology
- Appendix 8.6.1 - County Landscape Character Assessments
- Appendix 8.6.2 - CPRE Tranquillity Mapping
- Appendix 8.9.1 - Summary of Effects at Representative Viewpoints
- Appendix 9.2.1 - Ecology and Nature Conservation Legislation
- Appendix 9.2.2 - Summary of Local Planning Policy: Ecology and Nature Conservation
- Appendix 9.3.1 - Summary of Stakeholder Scoping Responses – Ecology and Nature Conservation
- Appendix 9.6.1 - Ecological Desk Study (Part 1)
- Appendix 9.6.1 - Ecological Desk Study (Part 2)
- Appendix 9.6.1 - Ecological Desk Study (Part 3)
- Appendix 9.6.2 - Ecology Survey Report (Part 1)
- Appendix 9.6.2 - Ecology Survey Report (Part 2)
- Appendix 9.6.2 - Ecology Survey Report (Part 3)
- Appendix 9.6.2 - Ecology Survey Report (Part 4)
- Appendix 9.6.2 - Ecology Survey Report (Part 5)
- Appendix 9.6.2 - Ecology Survey Report (Part 6)
- Appendix 9.6.2 - Ecology Survey Report (Part 7)
- Appendix 9.6.3 - Bat Trapping and Radio Tracking Surveys
- Appendix 9.9.1 - Habitat Regulations Assessment Report
- Appendix 10.3.1 - Summary of Stakeholder Scoping Responses – Geology and Ground Conditions
- Appendix 10.9.1 - Preliminary Risk Assessment
- Appendix 11.2.1 - Summary of Local Planning Policy: Water Environment
- Appendix 11.3.1 - Summary of Stakeholder Scoping Responses - Water Environment
- Appendix 11.9.1 - Flood Risk Assessment (Part 1)
- Appendix 11.9.1 - Flood Risk Assessment (Part 2)
- Appendix 11.9.1 - Flood Risk Assessment (Part 3)
- Appendix 11.9.2 - Water Environment Regulations Compliance Assessment
- Appendix 11.9.3 - Geomorphology Assessment
- Appendix 11.9.4 - Water Supply Assessment
- Appendix 12.3.1 - Summary of Stakeholder Scoping Responses – Traffic and Transport
- Appendix 12.9.1 - Preliminary Transport Assessment Report (PTAR) (Part 1)
- Appendix 12.9.1 - Preliminary Transport Assessment Report (PTAR) (Part 2)
- Appendix 12.9.1 - Preliminary Transport Assessment Report (PTAR) (Part 3)
- Appendix 12.9.1 - Preliminary Transport Assessment Report (PTAR) (Part 4)
- Appendix 12.9.1 – Preliminary Transport Assessment Report (PTAR) (Part 4) Appendix A: Uncertainty Log*
- *Added on 1 November
- Appendix 12.9.1 - Preliminary Transport Assessment Report (PTAR) (Part 5)
- Appendix 12.9.2 - Highway Flows
- Appendix 13.2.1 - Summary of Local Planning Policy: Air Quality
- Appendix 13.3.1 - Summary of Stakeholder Scoping Responses – Air Quality
- Appendix 13.4.1 - Air Quality Assessment Methodology
- Appendix 13.6.1 - Air Quality Data and Model Verification
- Appendix 13.6.2 - Air Quality Sensitive Receptors and Background Pollutant Concentrations
- Appendix 13.8.1 - Air Quality Construction Phase Mitigation
- Appendix 13.9.1 - Air Quality Results Tables and Figures
- Appendix 14.3.1 - Summary of Stakeholder Scoping Responses – Noise and Vibration
- Appendix 14.9.1 - Construction Noise
- Appendix 14.9.2 - Air Noise
- Appendix 14.9.3 - Ground Noise
- Appendix 14.9.4 - Road Traffic Noise
- Appendix 14.9.5 - Noise Envelope
- Appendix 15.2.1 - Summary of Local Planning Policy - Climate Change and Carbon
- Appendix 15.3.1 - Summary of Stakeholder Scoping Responses – Climate Change and Carbon
- Appendix 15.4.1 - Climate Change and Carbon Technical Appendix
- Appendix 15.4.2 - Climate Change Resilience (CCR) Definitions
- Appendix 15.9.1 - Climate Change Resilience (CCR) Assessment
- Appendix 15.9.2 - In-combination Climate Change Impacts (ICCI) Assessment
- Appendix 16.2.1 - Summary of Local Planning Policy: Socio-economics
- Appendix 16.3.1 - Summary of Stakeholder Scoping Responses – Socio-economics
- Appendix 16.6.1 - Socio-Economic Data Tables
- Appendix 16.6.2 - Assessment of Population and Housing Effects
- Appendix 17.2.1 - Summary of Local Planning Policy: Health and Wellbeing
- Appendix 17.3.1 - Summary of Stakeholder Scoping Responses – Health and Wellbeing
- Appendix 17.6.1 - Health and Wellbeing Baseline Conditions
- Appendix 18.2.1 - Summary of Local Planning Policy: Agricultural Land Use and Recreation
- Appendix 18.3.1 - Summary of Stakeholder Scoping Responses – Agricultural Land Use and Recreation
- Appendix 18.6.1 - Published Agricultural Land Classification Data
- Appendix 18.6.2 - Soil Survey Results
- Appendix 18.6.3 - Recreational User Survey
- Appendix 19.4.1 - Cumulative Effects Assessment Long and Short List
Other Technical Documents
Economic Impact Assessment - provides the initial findings of an Economic Impact Assessment of our Project. Read our Economic Impact Assessment - view as PDF
Noise Insulation Scheme - provides details on the different levels of noise insulation available. Read our Noise Insulation Scheme - view as PDF
Outline Employment, Skills and Business Strategy - sets out how our Project will bring significant opportunities for new jobs, skills and business growth. Read our Outline Employment, Skills and Business Strategy - view as PDF
Land Use and Construction Phasing plans - various Masterplans of our Project. Read our Land Use and Construction Phasing plans - view as PDF